DHI Towers

The DHI Towers bring your Downhill event to life and display all aspects of our presentation both during sport and during our pre-show. Depending on your race schedulem the build will commence on either the Tuesday or Wednesday morning of race week. This will be confirmed in the DRS.

​

The build process of this structure is complex and labour intensive. You can help us get this done quicker by making sure our requirements correct and ready when we arrive on-site.

​

As with all aspects of our delivery, the build phase is preceded by unloading the truck, please see here for more information on our unloading/loading requirements.

UCI-MTBWS-Loudenvielle-09-24 (2).jpeg

Power:

A stable and sufficient power supply is essential to successful deployment of the gantry. Unless discussed otherwise, power will be required from 12:00 on the Tuesday of race week.

​

Dedicated power, 2 x 32/3 - 5 Pin (3P + N + E) terminated with a ceeform/commando/IEC 60309. One feed to each tower with minimum 5m of slack cable.​​​​​​​​​​​​​​​​​​

image.png

Cross Track Ducting:

As the DHI Towers sit on opposite sides of the track, we require a pre-dug conduit, the full width of the track to link the tower locations to run cables.

​

Ducting must have a minimum diameter of 200mm, must have a cable pull line installed and must not create a cable run from one tower to the other of greater that 40m.